Search Results


Save This Search

Receive daily email alerts when new matching jobs are posted!

Sort jobs by:

New Search
  • Systems Engineer Sr / Configuration Management Job ID: 447827BR Date posted: Sep. 19, 2018 City: ...

    Lockheed Martin — 2018-09-20  
  • Aircraft Field Support Engineer Senior, F-35 Program Job ID: 452758BR Date posted: Sep. 21, 2018 ...

    Lockheed Martin — 2018-09-22  
  • Mult Fnc Info Sys Analst Patuxent River, Maryland

    Mult Fnc Info Sys Analst Job ID: 420887BR Date posted: Jan. 24, 2018 City: Patuxent River ...

    Lockheed Martin — 2018-09-13  
  • Desktop Support Analyst Patuxent River, Maryland

    Desktop Support Analyst Job ID: 451694BR Date posted: Sep. 18, 2018 City: Patuxent River ...

    Lockheed Martin — 2018-09-19  
  • Project Scheduler Glenrothes, United Kingdom

    Job Title: Project SchedulerLocation(s): GlenrothesSummary of Role: Work within Integrated project teams to provide project planning, risk management and cost control support. ...

    Raytheon — 2018-08-24  
  • Project Scheduler Pensacola, Florida

    Raytheon IIS is seeking a Program Planner/Scheduler for the development, maintenance, analysis, and reporting of IT and Cybersecurity-based project schedules, project documentation, ...

    Raytheon — 2018-09-07  
  • Mulifunction Information Systems Analyst Sr Stf Job ID: 436180BR Date posted: Jun. 04, 2018 City: ...

    Lockheed Martin — 2018-09-02  
  • Senior Technical Support Engineer II Lexington Park, Maryland

    The Whole Life Engineering (WLE) Department is made up of several disciplines whose main objective is to influence hardware and systems throughout their life cycle to ensure ...

    Raytheon — 2018-09-19  
  • Project Controller (Scheduler) AISRBroughtonSummary of RoleRaytheon UK are looking for a Project Controller to join the Integrated Project Team providing Project Planning, ...

    Raytheon — 2018-09-14  
  • Basic Qualifications Bachelor's degree or equivalent is required plus a minimum of 5 years of relevant experience; or Master's degree plus a minimum of 3 years of relevant ...

    General Dynamics Mission Systems — 2018-09-21  
  • Aircraft Technician/Maintenance Monitor Patuxent River, Maryland

    ManTech, a well-respected industry leader, is actively seeking talented professionals eager to support mission critical programs and solve some of the toughest problems critical ...

    ManTech — 2018-08-30  
  • CDM Scheduler Reston, Virginia

    ManTech is seeking a CDM Scheduler to support multiple task orders across its CDM Branch. This position will be responsible for managing the integrated master schedules (IMS) ...

    ManTech — 2018-09-16  
  • Project Controller (Scheduler) AISR Waddington, United Kingdom

    Project Controller (Scheduler) AISRWaddingtonSummary of RoleRaytheon UK are looking for a Project Controller to join the Integrated Project Team providing Project Planning, ...

    Raytheon — 2018-09-11  
  • Description About the Position: The Scheduler will be responsible for creating work breakdown structure and building and maintaining cost and resource loaded schedules in ...

    National Grid — 2018-09-19  
  • Scheduler Fort Meade, Maryland

    Entering ManTech?s 50th year, we hold the distinct honor of being named a ?Top 100 Global Technology Company? by Thomson Reuters. We have earned this and many other accolades ...

    ManTech — 2018-09-17  
  • Logistics QA Analyst II Patuxent River, Maryland

    EPS Corporation is seeking a Logistics QA Analyst II to join the Information Management Services Division team at our Patuxent River, MD office. Duties and Responsibilities ...

    EPS Corporation — 2018-09-05 Fast Apply  
  • CH-53K Maintenance Monitor Patuxent River, Maryland

    ManTech is a highly respected provider of mission-critical technology services to the federal government. We bring to each undertaking a thorough command of technology, a ...

    ManTech — 2018-09-05  
  • Triton Maintenance Monitor Patuxent River, Maryland

    ManTech is a highly respected provider of mission-critical technology services to the federal government. We bring to each undertaking a thorough command of technology, a ...

    ManTech — 2018-09-05  
  • Trainee Scheduler/Project Controller Broughton, United Kingdom

    Trainee Scheduler/Project ControllerBroughtonAn exciting opportunity to join Raytheon UK's Airborne Solutions business which brings together its special mission aircraft ? ...

    Raytheon — 2018-08-23  
  • Junior Program Analyst Lexington Park, Maryland

    Title: Junior Program Analyst Location: US-US-MD-Lexington Park Job Number: 1071809 Roles and Responsibilities: This position supports the PMA-265 F/A-18 Missions Systems ...

    Kellogg Brown & Root — 2018-08-23  

Fast Apply The Fast Apply badge indicates a job you can apply to with only two clicks! Post your resume once to MilitaryHire, and Fast Apply makes the application process easy. Perfect if you are searching for a job using your phone.

If your searches repeatedly bring up the same set of jobs, try sorting jobs by "best match to keywords" or "most recently posted."

The 200 best matches to your search criteria are listed.