Search Results


Save This Search

Receive daily email alerts when new matching jobs are posted!

Sort jobs by:

New Search
  • Operations Analyst Advisor San Diego, California

    This position is not yet funded General Dynamics Information Technology – Defense Division is currently looking for an Operations Analyst – Advisor to join our team.  The ...

    General Dynamics Information Technology — 2019-08-03  
  • Clinical Research Nurse (RN) San Diego, California

    GDIT is hiring an experienced Clinical Research Nurse to support the Naval Medical Center San Diego (NMCSD) in San Diego, California. “From the original tent dispensary ...

    General Dynamics Information Technology — 2019-08-11  
  • Do you have experience as an automotive engineer, a service technician, service advisor, manufacturer’s service representative or another related field? Raytheon Professional ...

    Raytheon — 2019-08-18  
  • DDG 1000 Trainer at San Diego, CA San Diego, California

    General Dynamics Information Technology is actively seeking DDG 1000 Trainer at the Zumwalt Training Facility located in San Diego, CA for immediate start Develops and ...

    General Dynamics Information Technology — 2019-07-28  
  • Do you enjoy tackling technical problems no one has solved before? Do you want to join a team that thrives on diversity of thought and innovative ideas?Principal or Senior ...

    Raytheon — 2019-08-07  
  • Cybersecurity ISSM Job ID: 483628BR Date posted: May. 14, 2019 City: San Diego State: California ...

    Lockheed Martin — 2019-08-21  
  • United States of America - California, San Diego Job Summary AECOM has an exciting opportunity for an experienced Maintenance/Functional Test Pilot Rotary Wing (MH-60R) ...

    AECOM — 2019-08-07  
  • Raytheon IDS, Portsmouth, RI or Marlborough, MA, Information Technology TeamIT Manager, Proposal and Program ExecutionSeapower Capabilities Systems Business Area(Manager III, ...

    Raytheon — 2019-07-29  
  • General Dynamics Information Technology is actively seeking a LCS OOD Trainer in LCS Training Facility, San Diego CA Develops; organizes; and conducts Navigation training ...

    General Dynamics Information Technology — 2019-08-05  
  • We are GDIT. The people supporting and securing some of the most complex government, defense, and intelligence projects across the country. We ensure today is safe and ...

    General Dynamics Information Technology — 2019-07-25  
  • Stormwater Team Manager San Diego, California

    United States of America - California, San Diego Job Summary AECOM is seeking a Stormwater Team Manager to oversee various stormwater engineering and compliance projects ...

    AECOM — 2019-08-07  
  • Biologist San Diego, California

    United States of America - California, San Diego Job Summary AECOM is actively seeking a creative, highly talented Project Manager/Biologist for immediate employment with ...

    AECOM — 2019-08-10  
  • Senior Project Manager San Diego, California

    United States of America - California, San Diego Job Summary Responsible for the overall management administration to project and assists in establishing project specific ...

    AECOM — 2019-08-07  
  • Scheduling Specialist San Diego, California

    United States of America - California, San Diego Job Summary The Program Management/Construction Management (PM/CM) business line specializes in the management of design ...

    AECOM — 2019-08-06  
  • Clinical Research Nurse (RN) San Diego, California

    GDIT is hiring an experienced Clinical Research Nurse to join our team in support of our client Navy Medical Center San Diego (NMCSD) in California. “From the original ...

    General Dynamics Information Technology — 2019-08-02  
  • Senior Command Level ASW Trainer at Fleet Anti-Submarine Warfare Training Center San Diego, CA Develops; organizes; and conducts Anti-Submarine Warfare training and educational ...

    General Dynamics Information Technology — 2019-08-04  
  • SWRMC Junior Naval Architect San Diego, California

    United States of America - California, San Diego Job Summary AECOM is actively seeking a Junior Naval architect to work in Code 241 at SWRMC. The position is located at ...

    AECOM — 2019-08-09  
  • United States of America - California, San Diego Job Summary AECOM is actively seeking an Integrated Class Maintenance Plan (ICMP) Manager and Assistant Assessment Director ...

    AECOM — 2019-08-06  
  • SWRMC Vibration Analysis Engineer San Diego, California

    United States of America - California, San Diego Job Summary AECOM is actively seeking a Vibration Analysis Engineer to work in Code 261 at SWRMC. The position is located ...

    AECOM — 2019-07-26  
  • SWRMC Junior Naval Architect San Diego, California

    United States of America - California, San Diego Job Summary AECOM is actively seeking a Junior Naval architect to work in Code 241 at SWRMC. The position is located at ...

    AECOM — 2019-07-26  

Fast Apply The Fast Apply badge indicates a job you can apply to with only two clicks! Post your resume once to MilitaryHire, and Fast Apply makes the application process easy. Perfect if you are searching for a job using your phone.

If your searches repeatedly bring up the same set of jobs, try sorting jobs by "best match to keywords" or "most recently posted."

The 200 best matches to your search criteria are listed.