About the PositionÂ
Were seeking a Senior Project Scheduler for large, heavy-civil infrastructure programsincluding highways, roads, bridges, transit (including rail and bus), and airport projects delivered through both traditional and alternative methods. Youll craft logic-driven CPM schedules, fold in procurement and third-party dependencies, and convert field data into clear progress updates and forecasts. By surfacing critical-path risks early, shaping recovery strategies, and keeping stakeholders aligned, youll help every project advance safely, efficiently, and on time.Â
This is a long-term, full-time, on-site position located in Fresno, CA.Â
Responsibilities may include, but are not limited to, the following Â
- Build and maintain an integrated CPM schedule that covers design through turnover, with logically linked activities, resource or cost loading, and clear coding for cost-control alignment.Â
- Collect field progress data, update status weekly or monthly, and produce look-aheads, variance reports, and earned-value forecasts.Â
- Run critical path and what-if analyses to test sequencing options, recovery plans, and alternative delivery scenarios.Â
- Perform schedule-risk assessmentsidentify drivers, quantify exposure with tools such as Monte Carlo simulations, recommend contingencies, and track mitigation actions.Â
- Support change orders and claims by preparing Time Impact Analyses that tie delays to cost and contractual entitlement.Â
- Integrate third-party interfaces, permitting, utility relocations, and long-lead procurement items, so the plan reflects all external dependencies.Â
- Generate concise narrative reports, Gantt charts, S-curves, and KPI dashboards for project managers, field teams, and executive stakeholders.Â
- Enforce schedule governance standards, maintain data integrity in scheduling tools, and mentor junior schedulers to raise overall planning maturity.Â
AttributesÂ
- Excellent written and verbal communication and interpersonal skills.Â
- Excellent multi-tasking and organizational skills.Â
- Collaborative mindset that fosters teamwork, trust, and positive relationships.Â
- Natural curiosity, problem-solving abilities, and a passion for continuous improvement.Â
Minimum Qualifications Â
- Bachelors degree in engineering, construction management, or related field, or equivalent combination of education and experience.   Â
- 10+ years of hands-on scheduling experience for large (>$500M), complex, rail transit projects. Â
- Experience working on projects delivered through traditional and alternative methods (e.g., DBB, DB, CM/GC, and P3).
- Experience with full CPM baseline schedule development, resource or cost loading, and progress updating.Â
- Experience with Earned Value Management (EVM), resource planning, and cashflow management. Â
- Experience applying risk analysis techniques to CPM schedules, including identification of schedule threats and mitigation strategies (e.g., Monte Carlo analysis).   Â
- Experience conducting forensic CPM scheduling to analyze and resolve project delay claims. Â
- Experience creating and presenting technical presentations in group settings and meetings.   Â
- Proficiency with risk software (e.g. Primavera Risk, @Risk, etc.).Â
- Proficiency with forensic scheduling software (e.g., Acumen Fuse, Schedule Cracker, Project Analyzer, etc.). Â
- Proficiency with industry standard project and construction management software (e.g., Primavera P6, TILOS, MS Project, Bluebeam, RSMeans, etc.).    Â
- Proficiency with Microsoft Office Suite/Office 365 (e.g., Outlook, Word, Excel, PowerPoint, Teams, etc.).Â
Preferred QualificationsÂ
- Masters degree in engineering or construction management.   Â
- Active professional certifications such as PSP (AACE), PMI-SP or PMP (PMI), and/or CCM (CMAA).    Â
- Proficiency with Power BI, Tableau, or similar platforms for building interactive dashboards and KPI visualizations.Â
Compensation DetailsÂ
The salary range listed for this role is $120k-$190k/year ($57-$91/hour). The final salary offered will be based on multiple factors and thoughtfully aligned with each candidates level of experience, breadth of skills, total education achieved, certifications/licenses that have been obtained, etc. Â Â
Just LOOK at the Benefits We Offer! Â
- Unlimited Flexible Time OffÂ
- Paid HolidaysÂ
- Paid Parental LeaveÂ
- Health InsuranceÂ
- Dental InsuranceÂ
- Vision InsuranceÂ
- Flexible Spending Accounts (Healthcare and Dependent/Elder Care)Â
- Long Term Disability InsuranceÂ
- Short Term Disability InsuranceÂ
- Life Insurance and Accidental Death & Dismemberment PolicyÂ
- 401(k) Plan with Guaranteed Employer ContributionÂ
- Formal Career Planning and Development ProgramÂ
- $2,500 Annually Towards Professional DevelopmentÂ
- Wellness Program with Monthly Wellness StipendÂ
- Company Cell Phone or Cell Phone Plan ReimbursementÂ
- Free Personalized Meal Planning & Nutrition Support With a Registered DietitianÂ
- Free Personal Financial Planning ServicesÂ
- Employee Assistance ProgramÂ
- Employee DiscountsÂ
- Employee Referral BonusÂ
- Specific plan details and coverage for each benefit noted above will be provided upon offer. #IN-LNJSÂ
Luster is committed to creating an inclusive work environment with a diverse workforce. All qualified applicants will receive consideration for employment without regard to criminal history, race, color, religion, gender, gender identity or expression, sexual orientation, national origin, genetics, disability, age, or veteran status. This employer participates in E-Verify. The employer will provide the Social Security Administration (SSA) and, if necessary, the Department of Homeland Security (DHS) with information from each new employee's I-9 to confirm work authorization.
All positions may be subject to a background check and drug test once a conditional offer of employment is made for any convictions directly related to its duties and responsibilities, in accordance with all applicable local, state, and/or federal regulations.
This job description is meant to describe the general nature and level of work being performed; it is not intended to be construed as an exhaustive list of all responsibilities, duties and skills required for the position.
Luster does not accept unsolicited resumes. In the absence of a signed agreement, Luster will not consider or agree to payment of any kind. Any unsolicited resumes presented to Luster personnel, including those submitted to Luster hiring managers, are deemed to be the property of Luster.
Please email hiring@luster.com for accommodations necessary to complete the application process.
Equal Opportunity Employer, including disability/protected veterans

Equal employment opportunity, including veterans and individuals with disabilities.
PI274625560