2025-08-21
DHL (https://group.dhl.com/en.html)
Other
/yr
full-time
employee
Kolkata
India
1. Purpose
Responsible for all inbound, outbound and transit operations at the Ground Hub during the shift; Ensure timely and accurate connections of shipments onto the ground network during the shift
|
2. Key Responsibilities
Responsibilities |
Operational · Supervise the entire shift operations in terms of inbound, outbound and transit operations for shipments mainly in terms of tally, documentation and loading operations for o Ensuring timely and accurate connections of shipments onto the approved ground network o Ensuring the timely and accurate dispatch of inbound loads to the respective service centers/ PUDs/ DCs/ directly to customers during the shift · Ensure on time arrival and departures of all loads during the shift; Coordinate with origin to provide information on load arrivals and ensure timely further connections of shipments to destination as per scheduled runs · Ensure smooth conduct of activities related to Point to Point operations, Multi-level billing operations and EDL/ ODA operations during the shift · Manage connections of daily inbound and outbound shipments on the rail network · In case of Rail operations, ensure timely load connections and receipt of loads to and from the railway stations · Ensure appropriate and accurate completion of paperwork and documentation for necessary regulatory clearances (octroi, sales tax, etc.) for all inbound, outbound and transit loads during the shift · Coordinate with check-posts and nakas for clearance of shipments
People
|
3. Key Result Areas and Key Performance Indicators
S. No | Key Result Areas | Key Performance Indicators |
1. | Ensure service quality and excellence in the Ground Hub | · Timely connectivity of inbound loads to the PUD / DCs (% compliance) |
· % Stock lying at hub (SLAH) | ||
· Timely updation of status (in scan, out scan, exceptions, pre-alerts etc) in the system (% compliance within TAT) | ||
· Adherence to SOPs (measured in terms of number of non-compliances/ deviations) as observed in audit: | ||
· Number of instances of misroutes and misconnections | ||
2. | Ensure Network Health in the shift | · Adherence to network timelines ( number of instances of delays in departure schedules of network vehicles) in the shift |
· % connectivity of shipments picked up within the cutoff times to the scheduled network runs in the shift | ||
3. | Ensure Performance Driven Culture | · Adherence to Performance Management system timelines and guidelines |