Project Scheduler - Miami - Military veterans preferred

2025-09-06
Shawmut Design and Construction
Other

/yr

  employee   contract


Miami
Florida
33137
United States


Project Scheduler - Miami

US-FL-Miami

Job ID: 2025-6548
Type: Regular Full-Time
# of Openings: 1
Category: Construction Operations
Miami

Overview

At Shawmut Design and Construction, we take pride in the culture we’ve built as a 100% employee-owned company—one that’s been recognized with more than 85 Best Place to Work awards. We’ve been honored as a National Fortune Best Workplace, a Fortune Best Workplace for Women, Millennials, and Parents, and one of America’s Best Employers by Forbes—along with numerous regional recognitions across our 11 offices nationwide.

 

Here’s a glimpse into what we offer:

  • Health, Dental, and Vision Insurance.
  • Employee Stock Ownership Plan (ESOP) – Be an employee-owner!
  • 401(K) with Company Match – Receive a company match up to 4% of your eligible pay.
  • Generous Paid Time Off – vacation and sick time, 12 holidays, summer Fridays, and a yearly volunteer day.
  • The Extras – Cell phone, laptop, tuition reimbursement, pet insurance, financial planning services, and more.


Responsibilities

Immediate opportunity for experienced Project Scheduler.  Must be Miami based or willing to relocate.  We have projects underway and are planning ahead for upcoming projects in 2026.

Do you have a great attitude with a strong client focus, and the ability to work in a collaborative environment?  Do you have the ability to prepare and maintain multiple schedules for projects ranging from $40M to $100M?

 

The responsibilities of this position include, but are not limited to, those listed below:???

  • Provide project schedule development with input from project managers, construction managers, designers, client & other stakeholders.
  • Provide updates to the project schedules and contribute to reporting requirements.
  • Provide cost and resource loading of the schedule for planning, design, construction, procurement and move-in.
  • Review and monitor schedules of other entities including, designers, contractors, etc.
  • Work on issues of diverse scope where analysis of situation or data requires evaluation of a variety of factors, including understanding of current business trends.
  • Provide detailed schedule analysis of time impacts, time extensions, and reporting.
  • Provide Baseline Schedule and monthly schedule update reviews, analysis and reports.
  • Accountable for the development, coordination, and execution of multiple project schedule on a day-to-day basis
  • Ensure proper set-up of and adherence to established best practices/processes.
  • Verifies that projects are set up in compliance with published guidelines 


Qualifications



Minimum Requirements

  • Must have 5-7+ years experience as construction scheduler
  • Must have vertical construction experience in the construction of projects ranging from $50M to $100M
  • Fluent in Oracle Primavera P6 and MS Project
  • Ability to read drawings
  • Must live a commutable distance to Miami office or are willing to relocate.

Preferred Qualifications

  • B.S. degree in Engineering, Architecture, Construction Management or related field
  • Must be able to develop a construction CPM schedule under the guidance of the regional scheduling manager utilizing design/construction drawings and construction experience/knowledge
  • Excellent communication skills with project team and ability to multi-task on several projects at once required.
  • Interfaces with clients and attends project meetings as needed on a regular basis.
  • Ability to assess the impact of design or construction changes and schedule slippages




Equal employment opportunity, including veterans and individuals with disabilities.

PI277801499