2025-09-23
E-Z Bel Construction
Other
/yr
employee
contract
San Antonio
Texas
78201
United States
Pipe Layer
SAN ANTONIO, TX
Field
POSITION SUMMARY
The Pipe Layer installs sewer, water, and storm drainage systems according to project specifications, grade requirements, and safety standards. This role prepares trenches, installs bedding, sets pipe, performs taps, and conducts testing to ensure proper alignment, slope, and system performance. Work is performed outdoors in all weather conditions and requires precision, physical stamina, and adherence to OSHA trenching and confined space protocols.
YOUR ROLE
WHAT YOU BRING
PHYSICAL REQUIREMENTS
Work is performed outdoors year-round in all weather conditions, including extreme heat, cold, rain, and other harsh environments. Must be able to stand, bend, kneel, and perform physically demanding tasks for extended periods. Regularly lifts and carries up to 50 lbs. and occasionally up to 100 lbs. with assistance while handling pipes, fittings, and tools. Must tolerate dust, noise, vibration, and maintain situational awareness around moving equipment and active excavation sites.
TRAVEL REQUIREMENTS
May require travel within Texas. Overnight or out-of-town stays may be needed based on project location.
PRE-SCREEN
Upon offer, employees will be required to complete and pass a pre-employment drug screen.
BENEFITS
E-Z Bel Construction, LLC is an equal opportunity employer. We encourage all qualified individuals to apply, regardless of race, color, religion, sex, national origin, sexual orientation, age, citizenship, marital status, disability, gender identity, or veteran status.
PI278259376