Project Scheduler - Military veterans preferred

2025-10-13
Luster National, Inc.
Other

/yr

  employee   contract


Atlanta
Georgia
30303
United States


Position Title: Project Scheduler


About the Position 

Were seeking a Project Scheduler for a large, heavy-civil transportation infrastructure program. Youll craft logic-driven CPM schedules, fold in procurement and third-party dependencies, and convert field data into clear progress updates and forecasts. By surfacing critical-path risks early, shaping recovery strategies, and keeping stakeholders aligned, youll help every project advance safely, efficiently, and on time.  

This is a long-term, full-time, on-site position located in the greater Atlanta area.  

Responsibilities may include, but are not limited to, the following  

  • Build and maintain an integrated CPM schedule that covers design through turnover, with logically linked activities, resource or cost loading, and clear coding for cost-control alignment. 
  • Collect field progress data, update status weekly or monthly, and produce look-aheads, variance reports, and earned-value forecasts. 
  • Run critical path and what-if analyses to test sequencing options, recovery plans, and alternative delivery scenarios. 
  • Perform schedule-risk assessmentsidentify drivers, quantify exposure with tools such as Monte Carlo simulations, recommend contingencies, and track mitigation actions. 
  • Support change orders and claims by preparing Time Impact Analyses that tie delays to cost and contractual entitlement. 
  • Integrate third-party interfaces, permitting, utility relocations, and long-lead procurement items, so the plan reflects all external dependencies. 
  • Generate concise narrative reports, Gantt charts, S-curves, and KPI dashboards for project managers, field teams, and executive stakeholders. 
  • Enforce schedule governance standards, maintain data integrity in scheduling tools, and mentor junior schedulers to raise overall planning maturity. 

Attributes 

  • Excellent written and verbal communication and interpersonal skills. 
  • Excellent multi-tasking and organizational skills. 
  • Collaborative mindset that fosters teamwork, trust, and positive relationships. 
  • Natural curiosity, problem-solving abilities, and a passion for continuous improvement. 

Minimum Qualifications  

  • Bachelors degree in engineering, construction management, or related field, or equivalent combination of education and experience. 
  • 5+ years of hands-on scheduling experience for heavy-civil infrastructure projects, specifically highways, roads, bridges, and passenger transit (bus and rail).
  • Experience with full CPM baseline schedule development, resource or cost loading, and progress updating. 
  • Proven ability to interpret design drawings, specifications, BIM models, and work-breakdown structures and translate them into logically sequenced activities. 
  • Experience conducting critical path and variance analyses, preparing Time Impact Analyses, and quantifying schedule risk using Monte Carlo or similar methods. 
  • Proficiency with industry standard project and construction management software (e.g., Primavera P6, TILOS, MS Project, Bluebeam, RSMeans, etc.)    
  • Proficiency with Microsoft Office Suite/Office 365 (e.g., Outlook, Teams, Word, Excel, PowerPoint, etc.) 

Preferred Qualifications 

  • Masters degree in engineering or construction management.
  • Active professional certifications such as PSP (AACE), PMI-SP or PMP (PMI), and/or CCM (CMAA). 
  • Experience with large (>$500M), complex, heavy-civil infrastructure projects that include highways, roads, bridges, transit (including rail and bus), and/or airport projects. 
  • Experience delivering projects through both traditional and alternative methods (e.g., DB, CM/GC, P3). 
  • Experience preparing and defending Time Impact Analyses, delay claims, and recovery plans before owners, contractors, and dispute resolution boards. 
  • Experience performing advanced schedule-risk assessments, including Monte Carlo simulations, P-Factor analysis, and P50/P80 forecasting. 
  • Proficiency in schedule risk analysis using tools such as Primavera Risk, Deltek Acumen Fuse, or @Risk.  
  • Proficiency with Power BI, Tableau, or similar platforms for building interactive dashboards and KPI visualizations. 

Compensation Details 

The salary range listed for this role is $90k-$140k/year ($43-$67/hour). The final salary offered will be based on multiple factors and thoughtfully aligned with each candidates level of experience, breadth of skills, total education achieved, certifications/licenses that have been obtained, geographic locations, etc. 

Just LOOK at the Benefits We Offer!  

  • Unlimited flexible time off  
  • Paid holidays  
  • Paid parental leave  
  • Health, dental, and vision insurance  
  • Flexible spending accounts (healthcare and dependent or elder care)  
  • Long-term disability insurance  
  • Short-term disability insurance  
  • Life insurance and accidental death and dismemberment 
  • 401(k) plan with guaranteed employer contribution  
  • Formal career planning and development program  
  • $2,500 annually toward professional development  
  • Wellness program with monthly wellness stipend  
  • Company cell phone or cell phone plan reimbursement  
  • Free personalized meal planning and nutrition support with a registered dietitian  
  • Free personal financial planning services  
  • Employee assistance program  
  • Employee discounts  
  • Employee referral bonus  

Specific plan details and coverage for each benefit noted above will be provided upon offer. #IN-LNJS

Luster is committed to creating an inclusive work environment with a diverse workforce. All qualified applicants will receive consideration for employment without regard to criminal history, race, color, religion, gender, gender identity or expression, sexual orientation, national origin, genetics, disability, age, or veteran status. This employer participates in E-Verify. The employer will provide the Social Security Administration (SSA) and, if necessary, the Department of Homeland Security (DHS) with information from each new employee's I-9 to confirm work authorization.

All positions may be subject to a background check and drug test once a conditional offer of employment is made for any convictions directly related to its duties and responsibilities, in accordance with all applicable local, state, and/or federal regulations.

This job description is meant to describe the general nature and level of work being performed; it is not intended to be construed as an exhaustive list of all responsibilities, duties and skills required for the position.

Luster does not accept unsolicited resumes. In the absence of a signed agreement, Luster will not consider or agree to payment of any kind. Any unsolicited resumes presented to Luster personnel, including those submitted to Luster hiring managers, are deemed to be the property of Luster.

Please email hiring@luster.com for accommodations necessary to complete the application process.




Equal Opportunity Employer, including disability/protected veterans



Equal employment opportunity, including veterans and individuals with disabilities.

PI278808262